Makeover, part II

Things do not always go as planned, a rule we all know but easily ignore. So: the electrician didn’t come to install the lights on Friday and everything got pushed back. The lights and ceiling tiles should be installed by the afternoon on Monday and then there is a massive clean-up needed. The old paint from the tin ceiling had been dripping on the old tiles for about 50 years and ended up on the floor as flakes and dust. Everything in the store had been shrouded in plastic, but still, everything will have to be wiped clean and vac-ed.